Oltmans Construction Co. provided construction services and self-performed the drywall work on the California Institute of Technology’s Keith Spalding 3rd Floor Renovation project. Working in a multi-story, occupied, educational building, Oltmans was vigilant in our noise and dust control practices as well as took extra precautions to ensure the safety of the building’s inhabitants. The scope of work was to reconfigure the 3rd floor of the 3-story plus basement building, which included soft demolition of existing offices, wall stud construction, doors and windows construction, carpet installation, millwork, drywall, HVAC (install flex duct), electrical, fire sprinkler system install, paint, addition of new ceiling grid, and lighting.

Total Square Footage:


3,000 s.f.