This project consisted of numerous tenant improvements including an elevator modernization, staircase repair, and renovation of an existing casino floor space into a High Stakes VIP Gaming Room and River Bar. The project included high-end finishes, custom millwork, doors, lighting, wall coverings, flooring, bar top and back bar. All was constructed while the casino was still in operation.