Oltmans Construction Co. provided preconstruction, general contracting, and concrete services for the construction of two (2), ground-up, office/warehouse buildings including all associated landscaping and site work. The buildings are located on the CR Laurence campus and are part of a series of projects that Oltmans Construction has built for the customer. The two projects were constructed and completed simultaneously.

2716 Vernon Ave., Vernon, CA: The project is a concrete tilt-up, two (2)-story, Type IIIB, office and warehouse building. The first floor includes 2,650 s.f. of office space as well as 21,352 s.f. of warehouse space. The second floor mezzanine includes 3,602 s.f. of office space.

2651 45th Street, Vernon, CA: The larger of the two projects is a concrete tilt-up, 2-story, Type IIIB, office and warehouse building. The first floor includes 11,500 s.f. of office space as well as a 71,366 s.f. warehouse. The second floor mezzanine includes 5,553 s.f. of office space. The building entrance features CRL’s Aluminum Unit Glazed Storefront System.