Working as a subcontractor for SunPower Corporation, Oltmans Construction’s scope of work included the installation of 6 photovoltaic array carports at existing Orange Coast College’s Adams Parking Lot with associated electrical equipment and installation of a shade structure over accessible parking. This project was completed under DSA Jurisdiction.

Fixed Tilt Carport System Summary

  • 1070.10 kWP ≈ 1 MW
  • (2460) 435W Modules
  • 10 Modules/String
  • 246 Strings Total

Related site improvements include:

  • AC and Concrete Pavement Patching
  • Parking Lot Lighting Replacement at Area of Work

Installation Size:


1 MW