3.86 MW Solar Rooftop Installation at the Transportation Inland Empire (TIE #1)

The project entails the installation of a solar photovoltaic system at the Transportation Inland Empire (TIE #1). The system is an electricity exporter to the utility grid. The installation consists of new rooftop structures with static mounted photovoltaic modules. The system is interconnected to and is operated in parallel with the Southern California Edison electric grid.

PV Module: Trina / Inverter: Satcon / Design By: Blue Oak Energy

Construction Manager: Prologis Logistics Services Incorporated

Installation Size: 3.86 MW