6.7 MW DC Solar Rooftop Installation at the Redlands Distribution Center #10 building

Oltmans Construction Co. role on the RDC #10 / SCE SPVP #48 project is Prime


Subcontractor for Hunter Environmental Group, the General Contractor, on this solar
rooftop installation project. This project is a 6.70 megawatts, rooftop mount, photovoltaic system and utilizes Trina modules and Satcon Inverters. It is part of Southern California Edison’s renewable energy program.

PV Module: Trina / Inverter: Satcon / Design By: Blue Oak Energy


Construction Manager: Prologis Logistics Services Incorporated
Installation Size: 6.70 MW