Oltmans completed construction on two adjacent Western Realco Industrial building projects. The project included core and shell as well as speculative tenant improvements (built for future tenant occupancy).

Building 1 highlights included:

  • 2-story concrete tilt-up
  • Office first floor 1,902 s.f.
  • Office second floor 2,000 s.f.
  • 39,285 s.f. warehouse
  • 5 – 9’x10’ dock high loading doors
  • 1 – 12’x14’ door to grade via concrete ramp
  • 8 – 3’x7’ doors
  • 26’ minimum clear height
  • K-17 ESFR sprinkler system
  • Fenced and secured truck yard
  • 71 car parking spaces
  • 2.262-acre land site (approximately 98,521s.f.)
  • 2.5% skylights
  • Trash enclosure
  • Complete site work – landscaping, sidewalks, fencing, etc.

Building 2 highlights included:

  • Single-story concrete tilt-up
  • Office first floor 1,872 s.f.
  • 48,160 s.f. warehouse
  • 5 – 9’x10’ dock high loading doors
  • 1 – 12’x14’ door to grade via concrete ramp
  • 9 – 3’x7’ doors
  • 30’ minimum clear height
  • K-17 ESFR sprinkler system
  • Fenced and secured truck yard
  • 83 car parking spaces
  • 2.372-acre land site (approximately 103,322 s.f.)
  • 2.5% skylights
  • Trash enclosure
  • Complete site work – landscaping, sidewalks, fencing, etc.

Square Footage:

Total Building Footprint 41,187 s.f.

Total Building Area 43,187 s.f.