Phase I


The project was built on the side of a hill around protected oak and sycamore trees. Building entry features include arcade panels, poured-in-place columns with steel trellises and accented entry panels with radius top and decorative glass accents. The project further features an on-site volleyball court.

Phase II


Two (2) two-story concrete tilt-up office buildings with associated site improvements. An arbor theme was used to unite all the buildings through a series of trellised walkways and eye-catching exterior tones.

Square Footage


Phase I: 71,250 s.f.
Phase II: 142,000 s.f.