Oltmans Construction provided shell construction for Walker Zanger’s new corporate headquarters and distribution center located in Los Angeles. The new 126,766 s.f. facility includes 15,188 s.f. office space, 18,299 s.f. mezzanine and 93,281 s.f. warehouse. The warehouse also included two (2) ea. 5 Ton Capacity Top Riding Single Girder Bridge Cranes installed to move the slabs and other material in the warehouse.

To view the panel tilting video visit: https://www.youtube.com/watch?v=jLbOJtv3MBE

Square Footage


126,766 s.f.