Page Title

Oltmans’ Downtown West MOB Wins Best Medical Project for 2020

Los Angeles, CA – February 24, 2020 – The construction team behind Downtown West MOB celebrates a Gold Award for “Best Medical Project,” presented by the LA Business Journal Commercial Real Estate Awards.

Read More ››

Cedars-Sinai Medical Center RAD Replacement

The project scope consists of the replacement of imaging equipment on the 8th floor of Cedars-Sinai Medical Center’s Mark Goodson building. Additionally, it includes the enlargement of a sub-waiting room; modifications to a control room to create an accessible patient dressing room; as well as all required electrical, HVAC, plumbing, fire protection, and fire alarm upgrades.

Anjana Bhowmik Promoted to Operations Director, Strategic Markets

October 9, 2018 – Oltmans Construction Co. is pleased to announce that Anjana Bhowmik, LEED AP, has been promoted to Operations Director, Strategic Markets.

Read More ››

Newest Retail Conversion for Healthcare: Moreno Valley Community Health Center

Moreno Valley, CA – July 2018 – Oltmans Construction Co. would like to extend a heartfelt congratulations to the County of Riverside University Health System Economic Development Agency (RUHS) on their grand opening of the Moreno Valley Community Health Center. Read More ››

Providence Breeze 2A

Tenant Improvement for 10,000 s.f. of existing facility and a 3,000 s.f. addition with an indoor therapy swimming pool. The project also includes remodel of existing parking lot and site work. When complete, the space will be used for physical therapy.

Square Footage: 10,420 s.f.

PIH Bloomfield MOB, Community Health Integrated

SANTA FE SPRINGS, CA – February 5, 2018 – Congratulations to Bloomfield Medical Office Building, PIH Health’s first ground-up primary & specialty care facility in Santa Fe Springs. Read More ››

Moreno Valley Community Health Center

The Moreno Valley Community Health Center was a conversion of an existing facility owned by Altura Credit Union into a two (2)-story tenant improvement project for the County of Riverside University Health System (RUHS). The project underwent a design/build MEP-FS process as well as required significant structural retrofits in order to achieve the Architect’s open design intent.

Architectural features in the final space included Herman Miller Healthcare System casework and furniture, axiom ceiling clouds located above each of the three (3) residency group spaces as well as specialty finishes such as oversized Spectrum architectural lights in all the main areas, 3form privacy screens in the check-in counters, custom linear wood ceilings and graphic wall coverings.

Healthcare Center programming include:

  • X-Ray room
  • 27 exam rooms
  • Two (2) procedure rooms
  • Three (3) soiled utility rooms
  • Three (3) clean utility rooms
  • Three (3) medical equipment rooms
  • Conference rooms
  • Three (3) residency group spaces
  • Two (2) staff break rooms/lounge areas
  • Staff patio addition
  • Two (2) patient waiting areas
  • Blood draw/specimen collection room

Square Footage:


26,000 s.f.

Downtown West Medical Office Building

The new Downtown West Medical project marks the first substantial healthcare investment in a historically under-served Los Angeles area. The success of this initial development could herald further healthcare investments in the area. The project is a contemporary 4-story, 60,000-square-foot outpatient medical office building and 9-story parking structure situated at Washington Boulevard and Hoover Street at the I-110/I-10 freeway intersection. Real estate investment firm Robhana Group and development firm Inception Property Group have already leased out the new building to HealthCare Partners, a DaVita Medical Group. It will be used for primary and urgent care services.

Square Footage:


60,000+ s.f.

Beach Boulevard Medical Pavilion

Construction of new single 2 story, 44,500 s.f. medical office building, Oltmans scope included core & shell construction, complete site work and landscaping improvements, and renovation of an existing parking structure. Project highlights include white oak stairs, European lobby wall tiling, and an iconic surfboard sculpture symbolizing the Huntington Beach lifestyle. Coordination between building tenants (MemorialCare and Fresenius Medical) and their contractors allowed this facility to be operational shortly after Oltmans scope was complete. Renovation of the existing parking structure required close collaboration between the Ware Malcomb, Oltmans, and our subcontractors to provide an innovative solutions for this aging structure. The pavilion will be a Class A medical office building located along busy Beach Blvd in Huntington Beach.

Building Features include:

  • On-site free surface and covered structure parking
  • Close proximity to the 405 freeway
  • Approximately 58,000 cars per day along Beach Boulevard

Square Footage:


44,500 s.f.

Bloomfield Medical Office Building

The three-story, 35,076 square-foot facility provides the local community with access to high-quality medical services close to their homes and places of work. While PIH Health has updated and revamped many existing medical offices throughout the area, this is its first completed ground-up construction project in the Santa Fe Springs/Norwalk area. Centrally located between PIH Health Hospital – Whittier and PIH Health Hospital – Downey, the new Santa Fe Springs medical office building brings multi-disciplinary care to the neighborhood coupled with the latest in medical technology and facility design. The Bloomfield Medical Office Building offers the following services:

  • An Eye Care Center.
  • A Family Medicine office where primary care is offered for the entire family.
  • An Orthopedics & Sports Medicine office where patients can be seen for a wide range of services related to diagnosing and treating bone and joint conditions.
  • A Radiology Department providing X-rays when necessary.
  • An Urgent Care Center that is open daily, including holidays.
  • A Community Pharmacy where prescriptions can be sent by your physician electronically after an appointment, filled by a pharmacist, and conveniently purchased on the way out.
  • One centralized lobby and check-in area welcomes visitors to expedite patient registration. There is open space on the building’s third floor for added services that will reflect the evolving needs of the community.

Building exterior features: The ground floor of this 3-story, steel building is clad in granite while the second through third floors are clad in pre-finished metal panels and ribbon windows. The facility has a larger “sister”, building on the PIH Hospital campus, the Ernest D. Wells Medical Office Building, with a very similar façade that serves as a type of branding for the Hospital.

Building Area: 35,076 s.f.

Site Area: 101,362 s.f.

Pacific Medical Office Building

Design / Build project of a two (2)-story core and shell medical office building for Pacific Medical Buildings. Oltmans scope included a 25,218 s.f. facility (68,535 s.f. site) with painted concrete tilt-up panels, storefront and curtain wall glazing as well as all associated on and off site work.

Square Footage

Total Building Area: 25,218 s.f.

Lot: 68,535 s.f.

Kaiser Permanente Santa Monica Medical Office Building

Construction of an 8-provider, plus required support services on the 2nd floor of a Medical Office Building located in Santa Monica CA (8,672 gross sf).

This lease tenant improvement falls under the RAD (Re-Imagining Ambulatory Design) concept. The basic requirements call for (6) Primary care providers with (2) specialty providers. These provider spaces will be supplemented with nursing modules and support spaces.

A key component of the design of the space is flexibility as there is a limited footprint to work within.

Square Footage 8,672 s.f.

Kaiser TRM Innovations Center

The new Kaiser Permanente Tustin Ranch Medical Offices is located just off the 5 freeway between Jamboree and Tustin Ranch. This new medical office houses Kaiser Permanente’s largest Pediatrics module in Orange County. Oltmans Construction Co. was hired to remodel the 4,500 s.f. of open space for the Kaiser Permanente Southern California Innovation and Learning Center.

The scope of work included a new interior entry storefront with herculite doors, glass panel modern fold doors, wood framed staircase, a unistrut ceiling support system, hang lights, speakers with an open ceiling concept, and an exterior courtyard inside the space. The innovation studio will have its own entrance located on the south end of the building separate from the main medical office entrance. Inside there will be a new large modern Collaboration Room and several small Collaboration Rooms with writeable surfaces throughout, glass magnetic boards, television monitors and two large BAF fans above the unistrut.

Square Footage:4,500 s.f.

Sierra Medical Group

The Sierra Medical Group project is a completely renovated building that was fully transformed into an attractive new medical center. The center features physician offices, 29 individual patient exam rooms, 10 well-equipped nursing stations, a large radiology department that includes rad fluoro (x-ray) equipment, a CT scanner, a hematology blood lab, and various wash stations. It also contains a comfortable conference room, staff break-rooms and plenty of other storage rooms. Additionally, a large office area specifically designated for the administrative support staff can be found on the over 5,000 s.f. second floor of this newly renovated medical facility.

Square Footage


18,406 s.f.

Rancho Cucamonga Medical Center

The Rancho Specialty Hospital project is a three-story, steel frame, fully developed medical office building with plaster exterior. This medical/surgical hospital consists of 49 beds, including 4 operating rooms, a large emergency room and final approval from OSHPD.

Square Footage


72,000 s.f.