Oltmans’ Amazon Services Division provided preconstruction and construction services for the complete build-out of the new Amazon DAX-7 project located in South Gate, California. In addition, Oltmans self-performed the structural concrete/masonry work.

The construction scope of work involved repurposing an existing 1-story warehouse. This included a new BMS (Building Management System), new MEPs, overhead and wall insulation (“conditioned-ready”), and fully sprinklered ESFR system as well as the build-out of break rooms, office areas, warehouse, and a training room.

In order for the delivery vehicles to be able to load inside, Amazon had Oltmans install a CO system. The building’s exterior also received an update along with all associated site improvements such as adding new driveway ramps, new associate entry and ADA switchback ramp, and all new landscape.

Square Footage: 226,960 s.f. (Building)