Working as a subcontractor for SunPower Corporation, Oltmans Construction’s scope of work included the installation of 6 photovoltaic array carports at existing Orange Coast College’s Adams Parking Lot with associated electrical equipment and installation of a shade structure over accessible parking. This project was completed under DSA Jurisdiction.
Fixed Tilt Carport System Summary
- 1070.10 kWP ≈ 1 MW
- (2460) 435W Modules
- 10 Modules/String
- 246 Strings Total
Related site improvements include:
- AC and Concrete Pavement Patching
- Parking Lot Lighting Replacement at Area of Work
Installation Size:
1 MW