4.50 MW DC Solar Rooftop Installation at Kaiser Distribution Center #05
Oltmans Construction Co. role on the KDC #07 / SCE SPVP #15 project is Prime Subcontractor for Hunter Environmental Group, the General Contractor, on this solar rooftop installation project.
The project is a 4.50 MW DC rooftop solar system for the power grid. This project utilizes 14,056 – 320 watt panels, 7 Satcon 500kw inverters, 2 masonry enclosures and one wrought iron fence enclosure. A temporary truck scale is installed for the tenant to use during construction.
PV Module: SunPower Solar / Inverter: Satcon / Design By: Blue Oak Energy
Installation Size: 4.50 MW