![](https://cdn.prod.website-files.com/6398a553b4d303370d733510/6410a5ba494cfb083c9e5d63_hero-image-05.webp)
Victorville, CA
Amazon XLX7 / SBD4 Project Loki
Demolition of an existing gunn-butt structure on the previously George Air Force Base and ground up construction of a 1,080,308 s.f. concrete tilt-up warehouse, site, shell, and Amazon T.I. build out. The anticipated SBD4 Traditional Non-sort (TNS) will comprise of 36,241 s.f. of office space and two (2) pick-mod mezzanine floors totaling 250,028 s.f.
Demolition of an existing gunn-butt structure on the previously George Air Force Base and ground up construction of a 1,080,308 s.f. concrete tilt-up warehouse, site, shell, and Amazon T.I. build out. The anticipated SBD4 Traditional Non-sort (TNS) will comprise of 36,241 s.f. of office space and two (2) pick-mod mezzanine floors totaling 250,028 s.f.