Oltmans Construction Co. provided preconstruction and construction services for the Goodman Way Pedestrian Bridge and Parking Lot project. The bridge is approximately 155’ long with two elevators. It supports two 54” tall, 127’ long beams with 16” wide x 1-1/2”thick top and bottom flanges. Parking lot is 4.7 acres with 26 security cameras, 731 stalls (including ADA parking, Clean Air/EV Charging Stations), and two emergency blue light phones.
Oltmans Construction Co. provided preconstruction and construction services for the Goodman Way Pedestrian Bridge and Parking Lot project. The bridge is approximately 155’ long with two elevators. It supports two 54” tall, 127’ long beams with 16” wide x 1-1/2”thick top and bottom flanges. Parking lot is 4.7 acres with 26 security cameras, 731 stalls (including ADA parking, Clean Air/EV Charging Stations), and two emergency blue light phones.
The bridge and parking lot was part of a larger contract for the Goodman Logistics Center Eastvale project. It was built concurrently with construction of Building 1 (LGB3) and offsites.